• About Us
  • The Team
  • Newsletter
  • Advertise with Us
GGRAsia
  • Home
  • Macau
  • Philippines
  • Singapore
  • Japan
  • Rest of Asia
  • World
  • Industry Talk
  • Trends & Tech
  • CSR
Reading: Soil remediation work starts at MGM Osaka site
Ad image
  • About Us
  • The Team
  • Newsletter
  • Advertise with Us
GGRAsia
  • Home
  • Macau
  • Philippines
  • Singapore
  • Japan
  • Rest of Asia
  • World
  • Industry Talk
  • Trends & Tech
  • CSR
Reading: Soil remediation work starts at MGM Osaka site
Ad image
Search
  • Home
  • Macau
  • Philippines
  • Singapore
  • Japan
  • Rest of Asia
  • World
  • Industry Talk
  • Trends & Tech
  • CSR
GGRAsia > Newsletter > Newsletter 4 > Soil remediation work starts at MGM Osaka site
JapanLatest NewsNewsletterNewsletter 4Top of the deck

Soil remediation work starts at MGM Osaka site

Newsdesk Published December 5, 2023
Share
2 Min Read

Work to guard against the risk of soil liquefaction and to deal with other land issues at the site of the planned MGM Osaka casino resort in Japan began on Monday, according to an announcement by the Osaka city and prefectural authorities.

The work on the site for the integrated resort (IR) is being done by contractors Takenaka Corp and Obayashi Corp, on behalf of Osaka IR KK,  a venture involving U.S.-based casino operator MGM Resorts International, Japan’s Orix Corp, and other smaller investors.

A project implementation agreement between the Osaka authorities and Osaka IR KK, signed on September 28, states that after ground preparations for the site at Yumeshima, an artificial island in Osaka Bay (pictured in a file photo), the construction-preparation effort should begin around summer 2024.

The ground measures include not only liquefaction countermeasures, but also dealing with underground obstacles and soil contamination.

In early September the Osaka authorities said it would be “autumn 2030” at the earliest before a resort could open, and that the initial investment cost of JPY1.08 trillion (US$7.34 billion currently) would rise by JPY190 billion.

Under the implementation agreement, the city government will reimburse Osaka IR KK for the soil preparation work, on condition that the implementation agreement remains in effect.

Osaka city has secured a maximum JPY78.8 billion in funding for fixing the land issues including soft-ground, underground-obstacle and soil-contamination matters. From that, JPY41.0 billion is for stabilising the soft ground.

On September 19, Osaka prefecture and city announced that a meeting of relevant experts convened by the authorities, estimated the cost of remedial measures for the land could be as low as JPY25.5 billion.

Share This Article
Facebook Twitter Whatsapp Whatsapp LinkedIn Email Copy Link Print

Latest News

GGR in Asia to grow around 5pct over next 18 months, but with variations from market to market: Moody’s
July 3, 2026
Jail time and big fines for online betting ops under new Bangladesh Gambling Prevention Act 2026
July 3, 2026
Cambodia casino regulator reviews measures to boost oversight of the sector
July 3, 2026

Most Popular

HeadlinesIndustry TalkLatest NewsNewsletterNewsletter 5World

Wynn partners with U.K. theatre producer Punchdrunk for slated 2027 opening of UAE resort

June 29, 2026
HeadlinesLatest NewsNewsletterNewsletter 3Rest of Asia

Melco Resorts boss Lawrence Ho meets Kazakhstan prime minister to discuss tourism partnership in country’s Alatau City

June 29, 2026
HeadlinesLatest NewsMacauNewsletterNewsletter 1

Christopher Ip resigns as SJM Holdings CFO, replaced by former NagaCorp exec Sean Tan

June 29, 2026
HeadlinesLatest NewsMacauNewsletterNewsletter 3

Moody’s reduces Wynn group credit outlook from ‘positive’ to ‘stable’ as leverage remains elevated

June 29, 2026

Code of Ethics

Privacy Policy

Useful Links

Contact Us

Follow US
Copyright 2026 TEAM Publishing and Consultancy Ltd / All rights reserved
Sign up to our FREE Newsletter

Subscribe now and never miss our latest news!

Zero spam, unsubscribe at any time.