• About Us
  • The Team
  • Newsletter
  • Advertise with Us
GGRAsia
  • Home
  • Macau
  • Philippines
  • Singapore
  • Japan
  • Rest of Asia
  • World
  • Industry Talk
  • Trends & Tech
  • CSR
Reading: Light rail Taipa section on track to open 2019: Macau govt
Ad image
  • About Us
  • The Team
  • Newsletter
  • Advertise with Us
GGRAsia
  • Home
  • Macau
  • Philippines
  • Singapore
  • Japan
  • Rest of Asia
  • World
  • Industry Talk
  • Trends & Tech
  • CSR
Reading: Light rail Taipa section on track to open 2019: Macau govt
Ad image
Search
  • Home
  • Macau
  • Philippines
  • Singapore
  • Japan
  • Rest of Asia
  • World
  • Industry Talk
  • Trends & Tech
  • CSR
GGRAsia > Newsletter > Newsletter 5 > Light rail Taipa section on track to open 2019: Macau govt
Latest NewsMacauNewsletterNewsletter 5Top of the deck

Light rail Taipa section on track to open 2019: Macau govt

Newsdesk Published July 18, 2018
Share
3 Min Read

The Taipa section of the under-construction light rail system in Macau, known as the LRT and designed to move visitors and locals around the city, is still scheduled to be operational by next year, the head of the city’s Transportation Infrastructure Office, Ho Cheong Kei, said on Tuesday.

The Taipa section (pictured in part) was originally slated to start operating in 2016. The bulk of construction on that stretch of the system began in 2012.

Mr Ho said during a closed meeting with members of the Macau Legislative Assembly that the budget for the Taipa section of the LRT should remain below MOP11 billion (US$1.37 billion). His comments were carried in a press release issued by the Transportation Infrastructure Office.

The Taipa portion of the project, which includes stops serving the Cotai casino resorts, will be 9.3-kilometres (5.8-miles) long and have a total of 11 stations. That stretch of the system will also connect to Macau International Airport and the Pac On ferry terminal located near the airport.

The LRT system will be overseen by a public company yet to be set up. The Macau government has hired Hong Kong’s MTR Corp Ltd – which manages the underground railway system in the former British colony – to manage and provide consultancy services for the LRT project.

No timetable has yet been announced for the start of construction on the Macau peninsula section of the rail link. But Mr Ho mentioned on Wednesday plans to link the Taipa portion of the project to Seac Pai Van in Coloane, and to Barra on Macau peninsula. The latter will be the first stop connecting the peninsular section to the Taipa section via the Sai Van bridge.

The government would also launch a feasibility study regarding the concept of connecting the Taipa line to the Border Gate checkpoint area on Macau peninsula. The latter is the main entry point into Macau for visitors from mainland China.

The Seac Pai Van and Barra links, plus the feasibility study regarding the Border Gate connection, are expected to cost on aggregate at least MOP5.4 billion, Mr Ho stated.

A number of investment analysts have expressed concerns that with the Macau gaming market increasingly focusing on mass-market customers, delays regarding public infrastructure projects could be a short- to medium-term negative for the new Cotai resorts.

Share This Article
Facebook Twitter Whatsapp Whatsapp LinkedIn Email Copy Link Print

Latest News

Okada Foundation, Aboitiz back digital-learning project for remote-location school
June 5, 2026
New China outbound-investment rules may weigh more on Macau-stock sentiment than on GGR: CLSA
June 5, 2026
Zitro sees strong early momentum in Asia for FANTASY cabinet: Bill Stefanakis
June 5, 2026

Most Popular

HeadlinesJapanLatest NewsMacauNewsletterNewsletter 2

Potential MGM Resorts buyout could trigger review of Macau, Japan assets: analysts

June 3, 2026
HeadlinesLatest NewsMacauNewsletterNewsletter 2

Macau’s May GGR above expectations but negatively impacted by low hold: Seaport

June 2, 2026
HeadlinesLatest NewsMacauNewsletterNewsletter 4

Macau casino GGR grows 7pct y-o-y in May, to US$2.8bln: govt

June 1, 2026
HeadlinesJapanLatest NewsNewsletterNewsletter 4

Osaka city to start soon RFP for Yumeshima expansion supporting MGM Osaka

June 4, 2026

Code of Ethics

Privacy Policy

Useful Links

Contact Us

Follow US
Copyright 2026 TEAM Publishing and Consultancy Ltd / All rights reserved
Sign up to our FREE Newsletter

Subscribe now and never miss our latest news!

Zero spam, unsubscribe at any time.