• About Us
  • The Team
  • Newsletter
  • Advertise with Us
GGRAsia
  • Home
  • Macau
  • Philippines
  • Singapore
  • Japan
  • Rest of Asia
  • World
  • Industry Talk
  • Trends & Tech
  • CSR
Reading: Macau airport upgrade for 10mln trips starts next year
Ad image
  • About Us
  • The Team
  • Newsletter
  • Advertise with Us
GGRAsia
  • Home
  • Macau
  • Philippines
  • Singapore
  • Japan
  • Rest of Asia
  • World
  • Industry Talk
  • Trends & Tech
  • CSR
Reading: Macau airport upgrade for 10mln trips starts next year
Ad image
Search
  • Home
  • Macau
  • Philippines
  • Singapore
  • Japan
  • Rest of Asia
  • World
  • Industry Talk
  • Trends & Tech
  • CSR
GGRAsia > Newsletter > Newsletter 3 > Macau airport upgrade for 10mln trips starts next year
Latest NewsMacauNewsletterNewsletter 3Top of the deck

Macau airport upgrade for 10mln trips starts next year

Newsdesk Published December 4, 2018
Share
2 Min Read

The operator of Macau International Airport, CAM, says design work on the new southern extension of the passenger terminal will begin next year, in preparation for construction of the three-level building.

In a statement released on Monday, CAM said the Passenger Terminal Building South Extension Design and Build Project would allow the airport (pictured) to handle 10 million passenger journeys a year. With the completion of the Passenger Terminal Building North Extension Project this year, the airport’s capacity increased to 7.8 million passenger journeys a year.

The airport handled nearly 7.17 million passenger trips last year – a new record – and in the first nine months of this year has handled nearly 6.16 million, CAM says.

The southern terminal extension will occupy an area of 5,700 square metres (61,354 sq feet) and a total floor area of 17,100 sq metres. The facility will house a supplementary departure hall; offices, shops, and places to eat and drink; a VIP area; and have three loading bridges.

CAM says it will use building information modelling (BIM) in pursuing the project. The company describes BIM as a novel technology meant to speed up projects and solve engineering problems by turning 2D drawings into 3D models. CAM used BIM in building the northern extension of the Macau International Airport passenger terminal, which opened this year.

Most of the gamblers in Macau’s casinos are tourists, and those who arrive by air are said – according to local government data – to have a greater value to the city’s tourism industry than day-trippers or those who arrive by ferry from Hong Kong or mainland China.

Share This Article
Facebook Twitter Whatsapp Whatsapp LinkedIn Email Copy Link Print

Latest News

Macau 5-star room occupancy down 5ppts in June, nightly rate dips 2pct: hotel assn
July 24, 2026
PhilWeb adds Games Global as its latest exclusive tie-up in online gaming sector
July 24, 2026
Wynn Palace expansion to lift group’s capex, leverage pressure: CreditSights
July 24, 2026

Most Popular

HeadlinesLatest NewsMacauNewsletterNewsletter 2

Macau daily GGR up as FIFA World Cup in ‘rearview’ mirror, July likely down 5pct y-o-y: Citi

July 20, 2026
HeadlinesLatest NewsMacauNewsletterNewsletter 2

Sands China 2Q EBITDA miss ‘too large to ignore’ amid worst-ever VIP luck: analysts

July 23, 2026
HeadlinesLatest NewsNewsletterNewsletter 2Rest of Asia

Many players at S.Korea casinos may lose anonymity under proposed AML rule changes: industry sources

July 21, 2026
HeadlinesLatest NewsNewsletterNewsletter 5Rest of Asia

Two Jeju-casino card dealers charged in relation to alleged fraud against Chinese gamblers

July 22, 2026

Code of Ethics

Privacy Policy

Useful Links

Contact Us

Follow US
Copyright 2026 TEAM Publishing and Consultancy Ltd / All rights reserved
Sign up to our FREE Newsletter

Subscribe now and never miss our latest news!

Zero spam, unsubscribe at any time.